PG&E Yosemite 1
PG&E Yosemite 2
PG&E Yosemite 3

Project Details

Name: 
PG&E: Nor Cal Distribution
Location: 
Yosemite and Sacramento Areas, CA
Project Size: 
4,000 Locations
Project Summary: 

Cupertino Electric, Inc. (CEI) has been working PG&E since 2014 throughout California's Sacramento and Yosemite regions to update PG&E's grounding system surge arrester equipment to meet new standards in their service territory. More than 20 CEI line crews worked in more than 4,000 locations across the Central Valley and Sacramento from three separate satellite yards to install new grounds in rocky site conditions. All of these locations were field surveyed and USA located with ground work performed and verified within eight weeks.

CEI pioneered new ground rod drilling techniques on this project to successfully install rods in tough conditions. Many of the PG&E locations involved inaccessible, mountainous terrain that required specialized equipment and seamless coordination with private landowners and third-party utilities to complete the work. Despite performing work in snowy and rainy conditions, CEI completed this scope without a work procedure error or injury.

Share This Project

SEARCH ALL PROJECTS
Array