PROJECT DETAILS:

NAME:
PG&E: Year 1 Solar

DESCRIPTION:
Cupertino Electric solar energy engineering design and construction project for PG&E

LOCATION:
Five Points and Helm, CA

PROJECT SIZE:
15 MW (Five Points) and 20 MW (Helm)

Project Summary

Cupertino Electric's Renewables Division completed two ground-mount, solar photovoltaic (PV) stations totaling 35 Megawatts (MW) for Pacific Gas and Electric Company (PG&E) in California’s Central Valley on September 29, 2011. Construction of the aggressivly scheduled project began in April 2011 and is comprised of two sites: a 20-MW site in Helm and a 15-MW site located in Five Points, California. The solar energy plants were engineered and constructed by Cupertino Electric.

The 20-MW Stroud Solar Station and 15-MW Westside Solar Station were designed and built by Cupertino Electric under a five-year, PG&E clean energy initiative, which includes up to 250 MW of utility-owned solar generation. The Stroud and Westside sites represent part of the first 50 MW of PG&E’s utility-owned generation. The generation plants are interconnected to the electric grid with the approval of California’s Independent System Operator (CAL-ISO) at local PG&E distribution substations.