Project Details

Name: 
Pierce College
Description: 
Cupertino Electric school engineering and construction project for Pierce College
Location: 
Woodland Hills, CA
Project Size: 
55,000 sq.ft on 5-acres
Project Attributes: 
Engineered
Green
Project Summary: 

This net zero, LEED® Gold certified design/build maintenance and operations facility project for Pierce College in Woodland Hills, California boasts the latest in sustainable design. The asphalt consists of recycled material and the walls and columns use recycled concrete. A low-maintenance metal roof and a water harvesting system have also been incorporated. LED lighting at the facility installed by our team helps to decrease maintenance and light pollution to the surrounding area. The 190 kilowatt (kW) solar energy system engineered and constructed by our team is to supplement the maintenance and operations facility’s power needs.

The facility housing the janitorial, landscaping, custodial, carpentry, repair, HVAC, electrical and locksmith departments of the college features a vehicle repair shop and a central courtyard that can accommodate the turning radius of a semi- and fire truck. The new facility centralizes material deliveries for the entire campus to maximize time and efficiency utilizing two docks located in the courtyard.

The office area of the 55,000 square-foot facility where the maintenance and operations department’s command center is located takes advantage of an open design to enhance collaboration. In addition, the office space is designed to operate as an on-campus refuge, in the event of an emergency.

Share This Project

SEARCH ALL PROJECTS
Array