Project Details

Name: 
SuccessFactors
Description: 
Cupertino Electric commercial office design and construction project for SuccessFactors in South San Francisco, California
Location: 
South San Francisco, CA
Project Size: 
90,000 sq. ft.
Project Attributes: 
Engineered
Project Summary: 

The SuccessFactors corporate headquarters project is located within the Centennial Towers, also a previous mixed-use office project of Cupertino Electric, in South San Francisco, California.

The design/build campus tenant improvement project for SuccessFactors occupies a total of 90,000 square-feet encompassing the top four floors of one tower. The special floor plans at the campus feature closed conference rooms within the core of the building surrounded by open office space. The project includes Lutron lighting controls, a new UPS installation addition to the existing emergency system, and high-end architectural lighting packages. Cupertino Electric also installed a complex fire alarm and smoke control system to serve a new, interconnecting stairwell between floors nine through 12 where the campus is located.

Share This Project

SEARCH ALL PROJECTS
Array