Project Details

Name: 
University of Pacific Dugoni School of Dentistry
Description: 
Cupertino Electric school electrical systems construction project for University of Pacific in San Francisco, California
Location: 
San Francisco, CA
Project Size: 
320,000 sq. ft.
Project Attributes: 
Green
Project Summary: 

This design/build, 320,000 square-foot school electrical systems tenant improvement project involved renovation of an existing seven-story building. Cupertino Electric installed new escalators and elevator systems with some of the existing elevators to remain in service with upgrades and refurbishment during construction. The project also includes new electrical switchgear, bus duct and distribution panels. The basement level at the School of Dentistry will be partially built-out for university functions, such as central sterilization. The remaining floors contain a large lecture hall, lounge area, separate entrances and elevator lobbies, clinic spaces, faculty and administrative office space, research laboratories, simulation laboratory work areas and other student spaces. Upon completion, this project received a LEED Silver Rating from the U.S. Green Building Council (USGBC).

Share This Project

SEARCH ALL PROJECTS
Array