Project Details

Name: 
University of Pacific Dugoni School of Dentistry
Description: 
Cupertino Electric school electrical systems construction project for University of Pacific in San Francisco, California
Location: 
San Francisco, CA
Project Size: 
320,000 sq. ft.
Project Attributes: 
Green
Project Summary: 

This design-build tenant improvement project involved renovating a seven-story 320,000 square-foot school building. Cupertino Electric installed new escalators and elevator systems while some of the existing elevators were upgraded and refurbished during construction. The project also included a new electrical switchgear, a bus duct and distribution panels. The basement level at the School of Dentistry was partially built-out for university functions, such as central sterilization. The remaining floors contain a large lecture hall, lounge area, separate entrances and elevator lobbies, clinic spaces, faculty and administrative office spaces, research laboratories, simulation laboratory work areas and other student spaces. Upon completion, this project received a LEED Silver rating from the U.S. Green Building Council (USGBC).

Share This Project

SEARCH ALL PROJECTS
Array